Investors
Investor Relations
Programme reporting for AEROGRID® — from Katrick Technologies, commercialized through CP Asia (HK).
Economics
Micro-Wind Solar Hybrid — 25-year economics
Grid power gets dearer every year. An AEROGRID asset's cost per kWh is set the day it is built.
25-year economics — grid power vs AEROGRID LCOE
Grid power costs are projected to more than double over 25 years; the AEROGRID levelised cost is fixed at build and rises only with indexed annual inflation. Figures are programme targets, not guarantees.
Investor news
Latest announcements
Successful China Trips Complete
On site live demos were held at the commercial validation center in Huizhou China from 26th August to the 5th September. The visits were extremely successful. More details to follow.
PartnershipHuizhou commercial validation hits 2.4 m/s cut-in wind speed
A new milestone from the Huizhou Commercial Validation programme — the AEROGRID® platform now begins generating at 2.4 m/s, wind conditions found across 90–95% of the Earth's surface.
TechnologyCommercial Validation Center opens in Huizhou
The AEROGRID® proof-of-concept validation window is now open, running through September 2026, with Vanguard partners invited to attend on site and lock-in MW allocation.
ProgrammeCP Asia appoints Oliver Maratos Director of Business Development for AEROGRID globally
CP Asia has appointed Oliver Maratos as Director of Business Development for AEROGRID® worldwide, bringing 25 years of cross-sector operating experience across Europe and Asia to the Vanguard territory programme.
AppointmentShowcase Array allocations open for December 2026 delivery
Vanguard territory partners can now reserve Showcase Array delivery slots, with the Vanguard purchase order carrying a $500k deposit against the MW+ MOU.
Programme
Calendar
Programme & financial calendar
Forward-looking milestone dates for the Vanguard Programme. Dates are targets and may move as Commercial Validation results are assessed.
| Date | Event | Type |
|---|---|---|
| Aug–Sep 2026 | Commercial Validation Center opens, Huizhou | Programme milestone |
| Oct–Nov 2026 | Site & yield assessment window | Programme milestone |
| Dec 2026 | Showcase arrays ship; Bosch Commercial Validation (TRL6) pathway | Programme milestone |
| Dec 2026 | MW purchase-order window opens | Commercial milestone |
| 2027 | MW-scale production queue & commercialization | Commercial milestone |
Reports & presentations
Reports & publications
AEROGRID® is currently a private programme. Published material is listed below; interim and annual reporting will be added here as it becomes available.
Interim reports, annual reports and results presentations will be listed here by year as they are issued. Further programme material is available on request under NDA.
Request programme materialThe Vanguard Programme
What a territory partner holds
Vanguard partners take an exclusive territory position ahead of MW-scale production in 2027.
Unlock US$25M Year-1 new revenue
Exclusive territory partner, revenue economics from deployment year.
25-year compounding service income
Local service partner revenue compounding across the warrantied asset life.
Measurable ESG impact
Firm renewable generation in populated, land-constrained regions.
Key programme figures
$0.08/kWh
Targeted LCOE
$0.07 at MW scale
24/7
Generation window
Wind 24/7, day and night, with daily solar and battery backup
25year
Hands-free service warranty
Auto-renews compounding annually
4×
Energy density
vs. solar panels by area
Definitions
Key metrics
Terminology used across AEROGRID programme reporting.
25-year economics — grid power vs AEROGRID LCOE
Grid power costs are projected to more than double over 25 years; the AEROGRID levelised cost is fixed at build and rises only with indexed annual inflation. Figures are programme targets, not guarantees.
- LCOE
- Levelised cost of energy. Lifetime cost of building and operating the asset divided by lifetime energy generated, expressed per kWh.
- Generation window
- The hours per day across which the platform produces power. AEROGRID targets a 24/7 power generating profile by combining turbulent wind with sun-tracking solar.
- Energy density
- Usable energy generated per unit of installed land area, compared against a solar-panel baseline of equivalent footprint.
- Hex Unit
- The individual hexagonal ducted panel that houses the oscillating aerofoils. Roughly 12 Hex Units make up a 32kW array.
- Showcase Array
- A Vanguard partner's first installed AEROGRID array, delivered from December 2026, used to validate local yield and grid connection.
- TRL6
- Technology Readiness Level 6 — a system prototype demonstrated in a relevant operational environment. The Bosch Commercial Validation pathway targets TRL6 in December 2026.
Corporate governance
Governance
Programme governance sits across the technology owner and the commercial entity.
Technology owner
Katrick Technologies Ltd holds the patents and the AEROGRID® trademark, and owns the engineering roadmap. All patents pending.
Commercial entity
CP Asia (HK) contracts with Vanguard territory partners and holds the service-provider relationship across the 25-year warranty term.
Board composition, committee charters, articles of association and remuneration policy belong in this section. Add them as documents once approved.
Contact IR
Contact Investor Relations
For programme material, Commercial Validation attendance or territory availability, contact the investor relations desk.
